Winton Hill Railway Trail Rock Cut Stabilization
Tenders are invited from experienced Contracting Companies for the above captioned project. The work involves scaling of the rock cut including the removal of vegetation, loose soil, rock, and overburden, stabilizing the rock face by installing rock bolts, filling small voids with lean concrete and applying architecturally rendered shotcrete to the stabilized rock cut.
Contractors submitting a tender for this work will be required to provide sufficient information to demonstrate their technical and financial capability to complete the works in accordance with the specification and contract drawings.
A site visit can be arranged by contacting Mike Murphy at 325-1655 or mmurphy@gov.bm
DEADLINE FOR SUBMISSION OF PROPOSAL DOCUMENTS – 3pm on Wednesday 8th November, 2017